Stay up to date with the latest breaking news, analysis and commentary on Mirae Asset Sharekhan. Find live updates, exchanges, stock news, earning news and more.
ACME Solar Holdings Ltd (ACME) has been emerged as a successful bidder in SECI’s e-reverse auction for the “Selection of RE Power Developers for assured
Peak Supply of 6000 MWh (1500 MW x 4 Hrs.) from ISTS-Connected RE Projects in India, under Tariff-Based Competitive Bidding (SECI-FDRE-IX).
Under this tender, the company secured 300 MW of contracted capacity at a discovered tariff of Rs. 6.00/kWh and will supply 1,200 MWh (300 MW X 4) supply,
during four-hour duration.
ACME already has the requisite connectivity grant and has secured a substantial portion of the land required for the project. This development readiness is
expected to significantly shorten the project execution timeline and facilitate timely commissioning.
Upon execution of the PPA, the project will add 1.2 GWh to ACME’s battery energy storage portfolio and increase the company’s PPA-signed BESS pipeline to
approximately 15 GWh.
At 1.27 pm, ACME Solar Holdings Ltd was trading at Rs. 399.45, down by 2.39%, with a volume of 1.54 lakh shares on the BSE.
Centre to sell up to 6% stake at a 10% discount to Monday's closing price
25 Aug 2026, 1:52PMACME Solar arm wins 300 MW capacity in SECI's 6000 MWh assured peak power tender
25 Aug 2026, 1:30PML&T wins order for Power Transmission & Distribution Business in Saudi Arabia
29-10-2025 10:13:15The ePlane Company signs MOU with Ramco Systems
27-10-2025 12:42:39Refex Industries gets an order worth Rs. 300 Cr from a mining entity in Jharkhand
24-10-2025 13:57:18Diwali Stocks Picks 2025