Sharekhan

HG Infra Engineering Ltd

Mon 1/12/2025,15:55:34 | NSE : HGINFRA

₹ 866.651.40 (0.16%)

Data is delayed. Analysis is best done in real-time! Open a FREE Sharekhan Demat A/c in 15 mins* and continue your analysis with real-time data.

Market Data

Essential tool: analyze, trade, manage, decide.

Open

₹ 873.95

Previous Close

₹ 865.25

Volume

89844

Mkt Cap ( Rs. Cr)

₹5648.05

High

₹ 888.90

Low

₹ 862.70

52 Week High

₹ 1559.00

52 Week Low

₹ 850.00

Book Value Per Share

₹ 452.60

Dividend Yield

0.00

Face Value

₹ 10.00

What’s Your Call?

Collective community sentiment on HG Infra Engineering Ltd

Your Vote -

Buy

78.95%

Hold

10.53%

Sell

10.53%

78.95%

19 users have voted

Market Depth

How many stocks are available to buy or sell and at what prices.

Buy Order Quantity

100%

Sell Order Quantity

0%

Bid Price

Qty

866.65

81

0.00

0

0.00

0

0.00

0

0.00

0

Bid Total

81

Bid Price

Qty

0.00

0

0.00

0

0.00

0

0.00

0

0.00

0

Bid Total

0

Option Chain

Analyzes market sentiment, predicts HG Infra Engineering Ltd' movement.

NO_RECORD_FOUND

News

Media spotlight triggers stock stock attention, sentiment.

  • HG Infra Engineering - Updates

    28 Nov 2025, 6:39PM H.G. Infra Engineering Limited has informed the Exchange regarding 'Execution of Battery Energy Storage Purchase Agreement by H.G. Choraniya Bess Priv
  • HG Infra Engineering - Execution Of Battery Energy Storage Purchase Agreement By H.G. Choraniya Bess Private Limited

    28 Nov 2025, 6:36PM Execution of Battery Energy Storage Purchase Agreement by H.G. Choraniya Bess Private Limited
  • HG Infra Engineering - Pendency of Litigation(s)/dispute(s) or the outcome impacting the Company

    26 Nov 2025, 1:42PM H.G. Infra Engineering Limited has informed the Exchange about Pendency of Litigation(s)/dispute(s) or the outcome impacting the Company
  • HG Infra Engineering - Intimation Under Regulations 30 & 51 Of SEBI (Listing Obligations And Disclosure Requirements) Regulat

    26 Nov 2025, 1:36PM Intimation under Regulations 30 & 51 of SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015 ('SEBI Listing Regulations')
  • HG Infra Engineering - Change in Management

    24 Nov 2025, 6:10PM H.G. Infra Engineering Limited has informed the Exchange about change in Management
  • HG Infra Engineering - Announcement under Regulation 30 (LODR)-Change in Management

    24 Nov 2025, 6:03PM Change in Senior Management Personnel
  • HG Infra Engineering - Updates

    21 Nov 2025, 4:31PM H.G. Infra Engineering Limited has informed the Exchange regarding 'H.G. Infra Engineering Limited has been declared as L-1 bidder by the Maharashtra
  • HG Infra Engineering - Announcement under Regulation 30 (LODR)-Award_of_Order_Receipt_of_Order

    21 Nov 2025, 4:25PM H.G. Infra Engineering Limited has been declared as L-1 bidder by the Maharashtra Metro Rail Corporation Limited
  • HG Infra Engineering - Incorporation

    20 Nov 2025, 3:53PM H.G. Infra Engineering Limited has informed the Exchange about Incorporation
  • HG Infra Engineering - Incorporation Of A Wholly Owned Subsidiary Company (Wos)

    20 Nov 2025, 3:25PM Incorporation of a Wholly Owned Subsidiary Company (WoS)
  • HG Infra Engineering - Updates

    19 Nov 2025, 3:00PM H.G. Infra Engineering Limited has informed the Exchange regarding 'H.G. Infra Engineering Limited has received an Order by the DLF Cyber City Develop
  • H.G. Infra Engineering wins Rs 274 cr Contract for DLF Downtown Phase-2 Infrastructure Works

    19 Nov 2025, 3:22PM H.G. Infra Engineering Ltd (HGINFRA) has announced that it has secured an order from DLF Cyber City Developers Limited for executing infrastructure wo
  • HG Infra Engineering - Announcement under Regulation 30 (LODR)-Award_of_Order_Receipt_of_Order

    19 Nov 2025, 2:51PM H.G. Infra Engineering Limited has received an order by the DLF Cyber City Developers Limited
  • HG Infra Engineering - Analysts/Institutional Investor Meet/Con. Call Updates

    18 Nov 2025, 3:11PM H.G. Infra Engineering Limited has informed the Exchange about Transcript
  • HG Infra Engineering - Announcement under Regulation 30 (LODR)-Earnings Call Transcript

    18 Nov 2025, 3:07PM Earning Call Transcript for Q2 & H1FY26
  • HG Infra Engineering - Copy of Newspaper Publication

    14 Nov 2025, 3:07PM H.G. Infra Engineering Limited has informed the Exchange about Copy of Newspaper Publication
  • HG Infra Engineering - Analysts/Institutional Investor Meet/Con. Call Updates

    13 Nov 2025, 10:01PM H.G. Infra Engineering Limited has informed the Exchange about Link of recordings
  • HG Infra Engineering - Earnings Conference Call Audio Recording For Q2 & H1FY26

    13 Nov 2025, 9:47PM Earnings Conference Call Audio Recording for Q2 & H1FY26
  • HG Infra Engineering - Investor Presentation

    12 Nov 2025, 8:33PM H.G. Infra Engineering Limited has informed the Exchange about Investor Presentation
  • HG Infra Engineering - Announcement under Regulation 30 (LODR)-Investor Presentation

    12 Nov 2025, 8:26PM Investor Presentation Q2 & H1FY26
  • HG Infra Engineering Q2 net profit down 24.06% at Rs 67.31 cr

    12 Nov 2025, 7:54PM The company reported standalone net profit of Rs 67.31 crore for the quarter ended September 30, 2025 as compared to Rs 88.64 crore in the same period
  • HG Infra Engineering - Outcome of Board Meeting

    12 Nov 2025, 7:01PM H.G. Infra Engineering Limited has submitted to the Exchange, the financial results for the period ended September 30, 2025.
  • HG Infra Engineering - Results - Financial Results For Quarter And Half Year Ended September 30, 2025

    12 Nov 2025, 6:40PM Results - Financial Results for Quarter and Half Year Ended September 30, 2025
  • HG Infra Engineering - Board Meeting Outcome for Outcome Of Board Meeting

    12 Nov 2025, 6:30PM Outcome of Board Meeting
  • HG Infra Engineering - Analysts/Institutional Investor Meet/Con. Call Updates

    7 Nov 2025, 1:30PM H.G. Infra Engineering Limited has informed the Exchange about Schedule of meet
  • HG Infra Engineering - Intimation Of Q2 & H1 FY26 Earnings Conference Call

    7 Nov 2025, 1:17PM Intimation of Q2 & H1 FY26 Earnings Conference Call
  • HG Infra Engineering - General Updates

    6 Nov 2025, 9:52PM H.G. Infra Engineering Limited has informed the Exchange about General Updates
  • HG Infra Engineering - Intimation For The Execution Of Securities Purchase Agreement With Neo Infra Income Opportunities Fund

    6 Nov 2025, 9:45PM Intimation for the execution of Securities Purchase Agreement with Neo Infra Income Opportunities Fund
  • HG Infra Engineering - Board Meeting Intimation for Intimation Of Board Meeting Under Regulations 29 And 50 Of The SEBI (List

    6 Nov 2025, 5:56PM H.G. Infra Engineering Ltdhas informed BSE that the meeting of the Board of Directors of the Company is scheduled on 12/11/2025 ,inter alia, to consid
  • HG Infra Engineering - Action(s) initiated or orders passed

    30 Oct 2025, 6:46PM H.G. Infra Engineering Limited has informed the Exchange about Action(s) initiated or orders passed
  • HG Infra Engineering - Intimation Under Regulations 30 And 51 Of The SEBI (Listing Obligations And Disclosure Requirements) R

    30 Oct 2025, 6:42PM Intimation under Regulations 30 and 51 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015
  • HG Infra Engineering - Updates

    16 Oct 2025, 6:38PM H.G. Infra Engineering Limited has informed the Exchange regarding 'Receipt of Completion Certificate for the Project in the state of Rajasthan'.
  • HG Infra Engineering - Receipt Of Completion Certificate For The Project In The State Of Rajasthan

    16 Oct 2025, 6:35PM Receipt of Completion Certificate for the Project in the state of Rajasthan
  • HG Infra Engineering has submitted to BSE the Shareholding Pattern for the Period Ended September 30, 2025

    16 Oct 2025, 4:50PM As of September 2025, 71.78% is owned by Indian Promoters and 28.22% by Public. <p align=justify> Institutional holds 13.93% (Insurance Companies 0.29
  • HG Infra Engineering - Certificate under SEBI (Depositories and Participants) Regulations, 2018

    9 Oct 2025, 12:20PM H.G. Infra Engineering Limited has informed the Exchange about Certificate under SEBI (Depositories and Participants) Regulations, 2018
  • HG Infra Engineering - Compliances-Certificate under Reg. 74 (5) of SEBI (DP) Regulations, 2018

    9 Oct 2025, 12:17PM Certificate in terms of Regulation 74(5) of the SEBI (Depositories and Participants) Regulations, 2018
  • HG Infra Engineering - Compliances-Half Yearly Communication - Debt Instruments

    8 Oct 2025, 9:56AM Submission of Specifications related to ISIN for Debt listed securities for the half year ended September 30, 2025.
  • HG Infra Engineering - Updates

    2 Oct 2025, 2:23PM H.G. Infra Engineering Limited has informed the Exchange regarding 'Receipt of Provisional Completion Certificate for the Project in the state of Andh
  • HG Infra Engineering - Receipt Of Provisional Completion Certificate For The Project In The State Of Andhra Pradesh

    2 Oct 2025, 2:27PM Receipt of Provisional Completion Certificate for the Project in the state of Andhra Pradesh
  • HG Infra Engineering - Updates

    1 Oct 2025, 2:59PM H.G. Infra Engineering Limited has informed the Exchange regarding 'Declaration of Provisional Appointed date/Appointed date by National Highways Auth
  • HG Infra Engineering - Declaration Of Provisional Appointed Date/Appointed Date By National Highways Authority Of India

    1 Oct 2025, 2:51PM Declaration of Provisional Appointed date/Appointed date by National Highways Authority of India
  • HG Infra Engineering - Change in Management

    25 Sep 2025, 12:34PM H.G. Infra Engineering Limited has informed the Exchange about change in Management
  • HG Infra Engineering - Announcement under Regulation 30 (LODR)-Change in Management

    25 Sep 2025, 12:31PM Change in Senior Management Personnel
  • HG Infra Engineering - Trading Window

    22 Sep 2025, 4:00PM H.G. Infra Engineering Limited has informed the Exchange regarding the Trading Window closure pursuant to SEBI (Prohibition of Insider Trading) Regula
  • HG Infra Engineering - General Updates

    19 Sep 2025, 6:34PM H.G. Infra Engineering Limited has informed the Exchange about General Updates
  • HG Infra Engineering - Announcement under Regulation 30 (LODR)-Acquisition

    19 Sep 2025, 6:32PM Intimation under Regulations 30 and 51 of the SEBI (Listing Obligations and Disclosure Requirements) Regulations, 2015
  • H.G. Infra Engineering Ltd

    24 Nov 2025 , 10:08AM HG Infra: The company, jointly with Kalpataru Projects International, has been declared the L-1 bidder by the Maharashtra Metro Rail Corporation in a joint venture bidding process. HG Infra has a 40% share and Kalpataru Projects International has a 60% share in the joint venture for the Metro Rail project worth Rs 1,415 crore. The project involves the design and construction of an elevated metro viaduct between UG Ramp and Balkum Naka, including the Depot Approach Viaduct and three special spans for the Thane Integral Ring Metro Project.
  • H.G. Infra Engineering Ltd

    22 Aug 2025 , 8:58AM HG Infra : HG Infra’s subsidiary, H.G. Narol Sarkhej Highway Pvt. Ltd., has received approval to upgrade a 10.63 km stretch of NH-47 (Narol–Sarkhej, Gujarat) under Hybrid Annuity Mode at a cost of Rs. 781 crore, with a construction period of 30 months. Positive
  • HG Infra Engineering Ltd

    11 Aug 2025 , 11:00AM H.G. Infra Engineering: In a joint venture with D.E.C. Infrastructure and Projects, the company has received a Rs 2,195.68 crore project from the Rail Land Development Authority to redevelop New Delhi Railway Station and construct associated infrastructure, with a 45-month completion timeline.
  • H.G. Infra Engineering Ltd

    6 Aug 2025 , 9:04AM H.G. Infra Engineering: The company received a letter of award for creation of Integrated Material Handling facility at the dockyard in Mumbai by Military Engineer Services in the state of Maharashtra.
  • HG Infra Engineering

    29 Jul 2025 , 12:29PM HG Infra Engineering : The company has acquired 100% equity in Angul Sundargarh Transmission Ltd from PFC Consulting on July 28, 2025. The cash deal aligns with HGIEL’s strategy to expand in the power transmission sector. ASTL will develop an inter-state transmission system for the Eastern Region Generation Scheme-I.
  • HG Infra Engineering

    24 Jun 2025 , 10:51AM H.G Infra: The company was declared as lowest bidder for a project worth Rs 118 crore by military engineer services in Maharashtra.
  • HG Infra Engineering

    29 Apr 2025 , 9:45AM Awarded a contract worth Rs 1,123 crore from NHAI. The project entails developing the six-lane Baunsaguar-Baraja Section of the NH-130-CD Road in Odisha. The hybrid annuity project is a part of the Raipur-Visakhapatnam Economic Corridor and is to be completed in 730 days. Positive
  • HG Infra Engineering

    29 Apr 2025 , 9:43AM Awarded a contract worth Rs 1,123 crore from NHAI. The project entails developing the six-lane Baunsaguar-Baraja Section of the NH-130-CD Road in Odisha. The hybrid annuity project is a part of the Raipur-Visakhapatnam Economic Corridor and is to be completed in 730 days. Positive
  • HG Infra Engineering

    22 Apr 2025 , 9:00AM HG Infra: Company has been declared as a qualified bidder by the Gujarat Urja Vikas Nigam Ltd for 300 MW/600 MWH for a contract value of Rs 2.856L/ MW/ month for setting up of Standalone Battery Energy Storage Systems in Gujarat under Tariff-Based Global Competitive Bidding (Phase-VI). GUVNL issued this tender in January 2025, the projects will operate under the Build-Own-Operate (BOO) model and will supply energy storage services to the state’s power distribution companies. Positive
  • HG Infra Engineering

    7 Feb 2025 , 9:51AM Declared as L-1 bidder by Rail Land Development Authority (RLDA) to develop the New Delhi railway station in a joint bid with DEC Infrastructure for a total contract value of Rs 2,196 crore. The redevelopment of the station will also involve construction of associated infrastructure on Engineering, Procurement and Construction (EPC) mode.
  • HG Infra Engineering

    6 Jan 2025 , 9:44AM H.G. Infra Engineering Limited has received a Letter of Intent (LOI) from Gujarat Urja Vikas Nigam Ltd for 250 MW/500 MWH Standalone Battery Energy Storage Systems in Gujarat under Tariff-Based Global Competitive Bidding (Phase-IV) with Viability Gap Funding Support for the said project. Positive
  • HG Infra Engineering

    24 Dec 2024 , 10:36AM The company's subsidiary has entered into a battery energy storage purchase agreement with NTPC Vidyut Vyapar Nigam for the procurement of 185 MW/370 MWh on a long-term basis. Positive
  • HG Infra Engineering

    16 Dec 2024 , 11:11AM The company’s arm received a letter of acceptance from the NHAI for an order worth Rs 862 crore. Positive
  • H G Infra Engineering

    11 Dec 2024 , 11:05AM H G Infra Engineering: Company bags project of worth Rs 763 crore under Hybrid Annuity Model (HAM). The project involves development of 63km of current stretch into two lanes. Positive
  • HG Infra Engineering

    25 Nov 2024 , 10:21AM The company has received the letter of award from the NTPC Vidyut Vyapar Nigam for the project “Procurement under tariff-based global competitive bidding (Ess-tranche no. 01) Request for Selection document for setting up of 500 mw/1000mwh standalone battery energy storage systems in India with viability gap funding support”. The order size is of 185 MW/370 MWh at a tariff rate of Rs. 2.38 lakh per MW per month. Positive for the stock.
  • HG Infra declare as L-1 bidder by MORTH

    25 Jul 2024 , 10:51AM HG Infra declared lowest bidder for a month project worth Rs. 898.5 cr
  • HG Infra Engineering

    19 Jun 2024 , 9:58AM The company has received a letter from South Central Railway on June 18, 2024, regarding the declaration of the appointed date for the project “Doubling of Track between Karanjgaon station & Aurangabad station including Electrification and Signaling works in connection with Aurangabad- Ankai Doubling Project in Nanded Division of South-Central Railway on Engineering, Procurement and Construction (EPC)” having project cost of Rs. 447 crores. Positive for the stock.
  • HG Infra Engineering

    26 Apr 2024 , 10:24AM The company entered into solar and green hydrogen EPC segment. H.G. Solar Projects, a wholly owned subsidiary of H.G. Infra Engineering, has incorporated the following wholly owned subsidiaries: 1. H.G. Jodhpur Solar Energy 2. H.G. Solar Project Developer and 3. H.G. Green Hydrogen Power. Positive for the stock.
  • HG Infra bags LoA worth Rs. 107 cr from Jodhpur Vidyut Vitran Nigam

    2 Apr 2024 , 11:30AM Receives Letters of Award from Jodhpur Vidyut Vitran Nigam Ltd
  • HG. Infra Engineering:

    1 Apr 2024 , 11:15AM A letter of award has been issued by Jodhpur Vidyut Vitran Nigam to Stockwell Solar Services consortium with H.G. Infra Engineering having tentative estimated cost of Rs. 220 crore (including GST). The Company has also entered into the EPC contracts dated March 30, 2024 with Norangdesar Solar Developer and Rasisar Solar Developer for the Solar Power Plants totalling Rs. 64 crore. Positive for the stock.
  • HG Infra Engineering

    26 Mar 2024 , 11:05AM A letter of award has been issued by Jodhpur Vidyut Vitran Nigam to Stockwell Solar Services Consortium with H.G. Infra Engineering for the project of Solar Business having estimated construction/development cost of Rs. 534 crores (including GST). Positive for the stock.
  • H.G. Infra Engineering

    19 Mar 2024 , 10:33AM Stockwall Solar Services Pvt Ltd’s joint venture consortium, HG Infra Engineering, has been awarded four solar projects worth Rs. 1,026 crore by Jodhpur Vidyut Vitran Nigam. The projects include the design, survey, supply, installation, testing, commissioning, operation and maintenance of the solar power plants for 25 years. Positive for the stock.
  • HG Infra Engineering

    13 Mar 2024 , 10:26AM The company has received a letter of acceptance from the East Central Railway for the construction of a double line track in Gaya-Son Nagar section, Bihar. The cost of the project is Rs 709 crore. Positive
  • HG Infra Engineering

    12 Mar 2024 , 12:19PM The Company has received the letter of award from the NHAI for the project “Access Controlled Highway of 4 Lane with Paved Shoulders from TN/AP.
  • HG Infra Engineering

    11 Mar 2024 , 9:57AM The Company has been declared as L-1 bidder by the NHAI for the project viz. “Access Controlled Highway of 4 Lane with Paved Shoulders from TN/AP Border to Puttur of NH-716 & 6 Lane with Paved Shoulders from Mallavaram to Renigunta of NH-71 in Andhra Pradesh on Hybrid Annuity Mode”. The bid project cost is Rs. 862.11 crore with a construction period of 24 months. Positive for the stock.
  • HG Infra Engineering

    1 Feb 2024 , 9:57AM The company has been declared as L-1 bidder by South Central Railway for the project “Doubling of Track between Karanjgaon station & Aurangabad station including Electrification and Signaling works in connection with Aurangabad- Ankai Doubling Project in Nanded Division of South Central Railway” with a bid project cost of Rs. 447.11 crore. Positive for the stock.
  • HG Infra gains on winning order by Central Railway

    12 Jan 2024 , 10:41AM HG Infra Engineering has been declare as L-1 bidder by Central Railway
  • HG Infra Engineering

    12 Jan 2024 , 10:22AM The company has been declared as L-1 bidder by Central Railway for the project viz. “Construction of New BG Line Between Dhule (Borvihir) to Nardana (~49.45 Km)” with a bid project cost of Rs. 716.11 crore. Positive for the stock.
  • HG Infra Engineering

    8 Jan 2024 , 11:06AM The company has received appointed date for Redevelopment of Kanpur Central Railway Station on EPC mode in Uttar Pradesh as October 16, 2023. The project cost is Rs. 655 crore with a completion period of 36 months. Positive for the stock.
  • HG Infra Engineering

    1 Dec 2023 , 10:56AM The company achieved financial closure for Varanasi-Ranchi-Kolkata HAM project having bid project cost of Rs. 1303 crore. Positive for the stock.
  • HG Infra Engineering

    10 Oct 2023 , 10:42AM The Company’s EGM will be held on October 31, 2023 to approve sale/transfer of its entire equity in three assets, (a) Gurgaon Sohna Highway; (b) H.G. Rewari Ateli Highway; and (c) H.G. Ateli Narnaul Highway, to the Purchaser, an infrastructure investment trust. As consideration for such transfer, the Company will have an enterprise value of Rs. 1,097 crores (translating to an equity value of ~Rs. 405 crores). Positive for the stock.
  • HG Infra Engineering

    3 Apr 2023 , 1:31PM The company has received the Letter of Award for two highway projects worth Rs 1,762.4 crore from National Highways Authority of India, in Jharkhand on hybrid annuity mode.
  • HG Infra Engineering

    31 Mar 2023 , 2:56PM The company has been declared as L-1 bidder by NHAI for the project “construction of 6 lane greenfield Varanasi-Ranchi-Kolkata highway in Jharkhand on HAM” for a bid project cost of Rs. 925.11 crore. Positive for the stock.
  • H G Infra Engineering

    23 Mar 2023 , 1:39PM The company has been declared as L1 bidder for redevelopment of Kanpur Central Railway station on EPC mode for bid project cost of Rs. 655 crore. Further, it has been declared as L1 bidder for construction of 6 lane greenfield Varanasi-Ranchi-Kolkata HAM project in Jharkhand at a bid project cost of Rs. 925.11 crore. Positive for the stock.
  • HG Infra emerge as L-1 bidder for railway project in Kanpur

    22 Mar 2023 , 11:05AM HG Infra Engineering emerges as lowest bidder for railway project worth Rs. 677 crore in Kanpur
  • HG Infra Engineering Ltd.

    23 Feb 2023 , 12:40PM HG Infra Engineering: The company has been declared as L-l bidder by Rail Vikas Nigam Limited, Chandigarh for the project in Himachal Pradesh. The project includes construction of foundations, substructure & superstructure along with river training/protection work, earthwork & allied works for viaduct 1 & 2, in connection with Bhanupali-Bilaspur-Beri new railway line in Bilaspur, Himachal Pradesh. The bid project cost by HG Infra is Rs 466.11 crore and the construction period is 30 months
  • HG Infra Engineering

    16 Jan 2023 , 10:13AM The company has received the Letter of Acceptance dated January 13, 2023 from Delhi Metro Rail Corporation (DMRC) for Rs. 398.63 crore project. Positive for the stock.
  • HG Infra's bid project cost was Rs. 997.1 cr

    30 Dec 2022 , 10:19AM HG Infra gets letter of award for a Haryana project from NHAI
  • HG Infra Engineering

    24 Nov 2022 , 9:38AM The company has received a letter from Adani Road Transport regarding declaration of appointed date as November 3, by Authority for project in Uttar Pradesh. The company will execute civil and associated works on EPC basis for development of an access-controlled six lane road project in Uttar Pradesh on DBFOT (toll) basis under PPP. The project will be completed within 820 days from appointed date. Positive for the stock.
  • HG Infra Engineering

    28 Sep 2022 , 10:30AM The company received completion certificate for its Rs. 606 crore Gurgaon Sohna HAM project in Haryana with effect from February 25, 2022. It also achieved financial closure of Rs. 772 crore Khammam Devarapalle HAM project in Telangana dated September 15, 2022. Positive for the stock.
  • HG Infra Engineering

    15 Sep 2022 , 10:48AM The company has received the letter from National Highways Authority of India ('NIIAI) dated September 14, 2022 regarding declaration of Appointed date as August 25, 2022 for the EPC project viz. 6 laning of Neelmangala-Tumkur in Karnataka having bid project cost of Rs. 1112 crore. Positive for the stock
  • HG Infra Engineering

    4 Apr 2022 , 10:06AM The company achieved financial closure of Kaliagura-Baunsaguar Section of NH- 130-CD Road under Raipur- Visakhapatnam Economic Corridor in Odisha on Hybrid Annuity Mode w.e.f. March 25, 2022. It also received provisional completion certificate for Ateli Namaul Highway HAM project w.e.f. March 11, 2022 and is eligible for early completion bonus. Positive for the stock.
  • HG Infra Engineering

    13 Jan 2022 , 1:30PM Public Works Department (PWD), Rajasthan, has annulled the tender for “Development and Maintenance of (1) Beawar Masuda Goyala Section of SH 26A (2) Arain Sarwar Section of SH-7E & (3) NH-12 Laxmipura Dora Dabi Ranaji ka Gudha Section of SH-115 through Public Private Partnership under Design, Build, Operate/Maintain & Transfer Basis” as the Letter of Award issued by the PWD, Rajasthan to the Company for an amount of Rs. 331.11 Crore against the HGIEL Bid Project Cost of Rs. 448.11 Crore was not accepted by the Company.
  • HG Infra Engineering

    3 Jan 2022 , 10:41AM The company received provisional completion certificate for its HAM project, Rewari-Ateli Package III, in Haryana. The provisional completion date is 15th November 2021. It has been completed 147 days prior to revised schedule completion date and is eligible for bonus. Positive for the stock.
  • HG Infra Engineering

    19 Oct 2021 , 9:47AM The company has been declared as L-1 bidder by NHAI for two HAM projects 1) Development of Six Lane Kaliagura Baunsaguar Section of NH-130-CD Road in Odisha at a bid project cost of Rs. 1492.11 crore and 2) Development of Six Lane Baunsaguar Baraja Section of NH-130 CD Road in Odisha at a bid project cost of Rs. 1123.11 crore. The company also has received the provisional certificate on October 17, 2021 for the EPC project vix. Development and Upgradation of Banar- Bhopalgarh-Kuchera project in Rajasthan having project cost of Rs. 207.11 crore. Positive for the stock.
  • HG Infra Engineering

    16 Sep 2021 , 10:47AM The company received the Letter of Award from NHAI for two HAM projects at an aggregate bid project cost of Rs. 1409.22 crore in Telangana. Positive for the stock.
  • HG Infra emerges Lowest Bidder for Road Project in Rajasthan

    14 Sep 2021 , 1:32PM HG Infra declare lowest bidder a project bv Public Works Department in Rajasthan
  • HG Infra Engineering

    26 Jul 2021 , 9:33AM HG Infra Engineering: The Company has received the Letter of Acceptance dated July 23, 2021 from NHAI for the EPC project in Delhi at bid cost of Rs. 1393 crore. The project is to be completed in two years. Positive read thru for the stock.
  • HG Infra Engineering

    14 May 2021 , 10:31AM HG Infra Engineering: Consolidated net revenues were up 67% y-o-y (up 41% q-o-q) to Rs. 1056 crore for Q4FY2021. OPM were up 107bps y-o-y (up 75bps q-o-q) to 18.2% leading to 77% y-o-y (up 47% q-o-q) rise in operating profit to Rs. 193 crore. Strong operational performance led to consolidated net profit growth of 104% y-o-y (up 64% q-o-q) to Rs. 111 crore.
  • HG Infra Engineering lowest bidder for project in Andhra Pradesh

    26 Mar 2021 , 10:19AM HG Infra Engineering declare as L-I bidder by the National Highways Authoritv of India (NHAI)
  • HG Infra Engineering

    26 Mar 2021 , 9:05AM The company has been declared as L1 bidder by NHAI for development of 31.8kms six lane Aluru-Jakkuva section of NH-130 in Andhra Pradesh on Hybrid Annuity Mode with a bid project cost of Rs. 1060 crore to be completed in 730 days. Positive for the stock.
  • HG Infra Engineering

    17 Mar 2021 , 10:23AM The Company has been declared L-1 bidder by NHAI for a Hybrid Annuity project in Telangana at a bid project cost of Rs. 772 crore. Positive for the stock.
  • HG Infra bags order worth Rs. 122.4 cr from NTPC

    16 Mar 2021 , 2:06PM HG Infra Engineering gets the purchase order from NTPC for the project
  • HG Infra Engineering

    25 Feb 2021 , 10:23AM HG Infra Engineering: The company has been declared L1 bidder by NTPC for Transportation of 26.41 lakh Cu.M. of Pond Ash from NTPC Ramagundam to NHAI-PIUMancherial road construction project at an estimated project cost of Rs. 122.38 crore to be completed within 15 months. Positive for the stock.
  • HG Infra Engineering

    27 Jan 2021 , 12:36PM HG Infra Engineering: Ircon International has cancelled the tender of GevraPendra/Pkg1 in the State of Chhattisgarh for which the Company was declared L-1 bidder. The estimated project cost was Rs. 713.69 crore and the Company's bid price was Rs. 784.99 crore. Negative for the stock.
  • HG Infra Engineering

    20 Jan 2021 , 2:09PM HG Infra Engineering: The company gets appointed date from NHAI as January 15, 2021 for construction of the proposed Rewari bypass in Haryana on a Hybrid Annuity Mode. The 14.4 km project is scheduled to be completed in two years and HG Infra placed a bid of Rs 522.02 crore.
  • HG Infra Engineering

    16 Dec 2020 , 10:22AM H.G.Infra Engineering: the Company has been declared as L-I bidder by lrcon Intemational for a project bided at Rs. 784.99 crore. Positive for the stock
  • HG Infra Engineering

    9 Nov 2020 , 11:31AM The company received 7th November 2020 as appointed date for one of its EPC project having bid project cost of Rs. 903.43 crore.
  • HG Infra Engineering Ltd.

    21 Jan 2020 , 10:56AM H.G. Infra Engineering has received the appointed date i.e. 14.01.2020 from the National Highways Authority of India for upgradation of four laning of Rewari-Ateli Mandi (Package III) section in Haryana on Hybrid Annuity Mode. Positive for the stock.
  • HG Infra bags highway project from NHAI

    27 Dec 2019 , 10:35AM HG Infra bags Rs. 522 crore highway project in Haryana from NHAI
  • HG Infra Engineering

    11 Nov 2019 , 11:22AM H.G.Infra Engineering reported 60% y-o-y rise in consolidated net profit to Rs. 41 crore which was led by healthy topline growth (up 11.6% y-o-y to Rs. 479 crore), expansion in OPM (higher 165BPS y-o-y to 16.1%) and lower effective tax rate (20.3% Vs 34.4% in Q2FY2019).
  • HG Infra bags an EPC order worth Rs. 189.49 crore

    27 Feb 2019 , 1:21PM HG Infra secures EPC order from Megawide Construction DMCC for Flexible & Rigid Pavement
  • HG Infra declare as lowest bidder for NHAI project

    25 Feb 2019 , 2:43PM HG Infra declare as lowest bidder for NHAI project worth Rs. 950 crore; bid cost at Rs. 766 crore
  • HG Infra emerges lowest bidder for EPC project

    20 Feb 2019 , 2:09PM HG Infra has been declare as lowest bidder for EPC project in Rajasthan

Key fundamentals

Evaluate the intrinsic value of HG Infra Engineering Ltd stock 

Name March-25 March-24 March-23 March-22 March-21
Assets 3952.696 2769.7 2282.102 1678.998 1258.914
Liabilities 3952.696 2769.7 2282.102 1678.998 1258.914
Equity 65.171 65.171 65.171 65.171 65.171
Gross Profit 950.721 821.974 710.303 584.743 410.67
Net Profit 577.116 545.488 421.383 338.76 210.96
Cash From Operating Activities 119.557 271.015 587.091 114.003 527.331
NPM(%) 9.53 10.65 9.53 9.37 8.34
Revenue 6051.881 5121.744 4418.536 3615.195 2527.5
Expenses 5101.16 4299.77 3708.233 3030.452 2116.83
ROE(%) 19.56 18.49 14.28 11.48 7.15

Shareholding Pattern

Corporate Action

XD-Date Dividend-Amount Dividend-% Dividend Yield(%GE) Price on that day
12 Aug 2025 2 20 0 1253.8
14 Aug 2024 1.5 15 0 1185.55
14 Aug 2023 1.25 12.5 0 912.75
21 Jul 2022 1 10 0 588.35
27 Aug 2021 0.8 8 0 292.6
01 Aug 2019 0.5 5 0 275.35
31 Aug 2018 0.5 5 0 327.1

Peers

Other companies within the same industry or sector that are comparable to HG Infra Engineering Ltd

Company Price Price (% change) pe(x) EV/EBITDA(x) ROE(%) ROCE(%)
Prajay Engineers Syndicate Ltd 31.09 0.68 0.00 6064.13 -39.61 0.00
Hubtown Ltd 305.25 -2.27 33.95 11757.94 32.31 0.00
Shriram Properties Ltd 88.71 0.56 16.83 14769.31 45.24 0.00
IRB Infrastructure Developers Ltd 43.11 0.47 3.96 523641.69 1073.14 0.70

Company Info

Brief history of the Company The Company was incorporated as "H.G. Infra Engineering Private Limited" on January 21, 2003, as a private limited company under the Companies Act 1956, at Jodhpur, with a certificate of incorporation granted by the RoC. Pursuant to the conversion of the Company to a public limited company, the name was changed to "H.G. Infra Engineering Limited" and the RoC issued a fresh certificate of incorporation on June 8, 2017. Conversion of a Partnership Firm into the Company The Company was formed pursuant to the conversion of a partnership firm, M/s Hodal Singh Giriraj Singh & Co., Jodhpur (the "Partnership Firm") into the Company, a joint stock company under Part IX of the Companies Act, 1956 on January 21, 2003. The Partnership Firm was constituted pursuant to a partnership deed dated December 10, 1980, initially entered into amongst the original partners, Mr. Giriraj Singh, Mr. Bhagwan Singh, Mr. Hodal Singh, Mr. Pokhpal Singh, Mr. Devendra Singh, Mr. Ramswaroop Singh and Mr. Narpat Singh for the purpose of carrying out the business of, among others, public works department ("PWD"), railways, irrigation department or any other government or semi-government departments in respect of roads, bridges, dams, supply of material and technical consultation. Pursuant to the changes in the constitution of the partnership, the partnership deed was subsequently amended from time to time. The business of the Partnership Firm was taken over by the Company pursuant to the conversion and Mr. Bhagwan Singh, Mr. Hodal Singh, Mr. Pokhpal Singh, Mr. Girishpal Singh, Mr. Vijendra Singh, Mr. Harendra Singh and Mr. Rajendra Singh, the erstwhile partners of the Partnership Firm were issued and allotted 53,831 Equity Shares, 452,647 Equity Shares, 25,843 Equity Shares, 324,255 Equity Shares, 408,257 Equity Shares, 442,572 Equity Shares and 31,345 Equity Shares, respectively. For details, see "Capital Structure" Major events and milestones 2003 - Incorporation of the Company under Part IX of the Companies Act, 1956 2008 - Executed the first subcontract work of construction of embankment, among other things for an amount of Rs.149.13 million - Commenced construction of a portion of the Yamuna Expressway, worth Rs.1,160.60 million 2010 - Commenced the first major project as a subcontractor to carry out work of fthe laning of 49 kilometers on the Jaipur - Tonk Deoli section on National Highway 12, worth Rs. 2,574.40 million - Commenced work on a part of the project for development of road of 20 kilometers on the six laning work being carried out on National Highway 8, on the Ajmer bypass section for an amount of Rs. 563.80 million. 2011 - Commenced work on the project of fthe laning of the Warora Bamni section in Maharashtra for an amount of Rs.2,684.58 million 2014 - Executed construction of the Jaipur - Nagaur road from kilometer 63/500 (Bhatipura) to kilometer 101/700 (Narayanpur Tiraha) for a total cost of Rs.442.70 million Executed construction of the Jaipur-Nagaur road from kilometer 18/0 (Kalwar) to kilometer 63/500 (Bhatipura) for a total cost of Rs.561.40 million 2015 - Awarded construction project of fthe laning highway of National Highway 65, on the Kaithal- Rajasthan border for a cost of Rs.4,011.10 million, in the state of Haryana, awarded by Modern Road Makers Private Limited 2016 - Executed second renewal coat on the pavement of six lane Jaipur - Kishangarh section of National Highway 8 in the state of Rajasthan from kilometer 273.500 to kilometer 363.885 for a project cost of Rs.1,423.10 million 2017 - Conversion of the Company into a public limited company - Awarded seven construction projects in Maharashtra worth RS.19,045.90 million by MoRTH - Awarded two construction projects by NHAI worth Rs.4,140.00 million 2019 -H.G. Infra Engineering Ltd has informed that 'H.G. INFRA has been declared, L-1 for new HAM project under NHAI for Construction of proposed Narnaul Bypass (design length 24.0 km)-Ateli Mandi to Narnaul section of NH-11 from km 43.445 to km 56.900 (design length 14.0 km) as an Economic Corridor-Feeder route in the state of Haryana on Hybrid Annuity Mode'. 2024 -The Company Informed Execution of Battery Energy Storage Purchase Agreement by H.G. Banaskantha Bess Private Limited. -The Company Informed 'Receipt of Letter of Award from NTPC Vidyut Vyapar Nigam Limited. -The Company Receipt of Completion Certificate for the Project in the state of Rajasthan'. -The Company Receipt of Letter of Award from Jodhpur Vidyut Vitran Nigam Limited'.

Brief history of the Company The Company was incorporated as "H.G. Infra Engineering Private Limited" on January 21, 2003, as a private limited company under the Companies Act 1956, at Jodhpur, with a certificate of incorporation granted by the RoC. Pursuant to the conversion of the Company to a public limited company, the name was changed to "H.G. Infra Engineering Limited" and the RoC issued a fresh certificate of incorporation on June 8, 2017. Conversion of a Partnership Firm into the Company The Company was formed pursuant to the conversion of a partnership firm, M/s Hodal Singh Giriraj Singh & Co., Jodhpur (the "Partnership Firm") into the Company, a joint stock company under Part IX of the Companies Act, 1956 on January 21, 2003. The Partnership Firm was constituted pursuant to a partnership deed dated December 10, 1980, initially entered into amongst the original partners, Mr. Giriraj Singh, Mr. Bhagwan Singh, Mr. Hodal Singh, Mr. Pokhpal Singh, Mr. Devendra Singh, Mr. Ramswaroop Singh and Mr. Narpat Singh for the purpose of carrying out the business of, among others, public works department ("PWD"), railways, irrigation department or any other government or semi-government departments in respect of roads, bridges, dams, supply of material and technical consultation. Pursuant to the changes in the constitution of the partnership, the partnership deed was subsequently amended from time to time. The business of the Partnership Firm was taken over by the Company pursuant to the conversion and Mr. Bhagwan Singh, Mr. Hodal Singh, Mr. Pokhpal Singh, Mr. Girishpal Singh, Mr. Vijendra Singh, Mr. Harendra Singh and Mr. Rajendra Singh, the erstwhile partners of the Partnership Firm were issued and allotted 53,831 Equity Shares, 452,647 Equity Shares, 25,843 Equity Shares, 324,255 Equity Shares, 408,257 Equity Shares, 442,572 Equity Shares and 31,345 Equity Shares, respectively. For details, see "Capital Structure" Major events and milestones 2003 - Incorporation of the Company under Part IX of the Companies Act, 1956 2008 - Executed the first subcontract work of construction of embankment, among other things for an amount of Rs.149.13 million - Commenced construction of a portion of the Yamuna Expressway, worth Rs.1,160.60 million 2010 - Commenced the first major project as a subcontractor to carry out work of fthe laning of 49 kilometers on the Jaipur - Tonk Deoli section on National Highway 12, worth Rs. 2,574.40 million - Commenced work on a part of the project for development of road of 20 kilometers on the six laning work being carried out on National Highway 8, on the Ajmer bypass section for an amount of Rs. 563.80 million. 2011 - Commenced work on the project of fthe laning of the Warora Bamni section in Maharashtra for an amount of Rs.2,684.58 million 2014 - Executed construction of the Jaipur - Nagaur road from kilometer 63/500 (Bhatipura) to kilometer 101/700 (Narayanpur Tiraha) for a total cost of Rs.442.70 million Executed construction of the Jaipur-Nagaur road from kilometer 18/0 (Kalwar) to kilometer 63/500 (Bhatipura) for a total cost of Rs.561.40 million 2015 - Awarded construction project of fthe laning highway of National Highway 65, on the Kaithal- Rajasthan border for a cost of Rs.4,011.10 million, in the state of Haryana, awarded by Modern Road Makers Private Limited 2016 - Executed second renewal coat on the pavement of six lane Jaipur - Kishangarh section of National Highway 8 in the state of Rajasthan from kilometer 273.500 to kilometer 363.885 for a project cost of Rs.1,423.10 million 2017 - Conversion of the Company into a public limited company - Awarded seven construction projects in Maharashtra worth RS.19,045.90 million by MoRTH - Awarded two construction projects by NHAI worth Rs.4,140.00 million 2019 -H.G. Infra Engineering Ltd has informed that 'H.G. INFRA has been declared, L-1 for new HAM project under NHAI for Construction of proposed Narnaul Bypass (design length 24.0 km)-Ateli Mandi to Narnaul section of NH-11 from km 43.445 to km 56.900 (design length 14.0 km) as an Economic Corridor-Feeder route in the state of Haryana on Hybrid Annuity Mode'. 2024 -The Company Informed Execution of Battery Energy Storage Purchase Agreement by H.G. Banaskantha Bess Private Limited. -The Company Informed 'Receipt of Letter of Award from NTPC Vidyut Vyapar Nigam Limited. -The Company Receipt of Completion Certificate for the Project in the state of Rajasthan'. -The Company Receipt of Letter of Award from Jodhpur Vidyut Vitran Nigam Limited'.

Read More

Parent Organisation

HG Infra Engineering Ltd.

Founded

21/01/2003

Managing Director

Mr.Harendra Singh

NSE Symbol

HGINFRAEQ

FAQ

The current price of HG Infra Engineering Ltd is ₹ 866.65.

The 52-week high for HG Infra Engineering Ltd is ₹ 888.90 and the 52-week low is ₹ 862.70.

The market capitalization of HG Infra Engineering Ltd is currently ₹ 5648.05. This value can fluctuate based on stock price movements and changes in the number of shares outstanding.

To buy HG Infra Engineering Ltd shares, you need to have a brokerage account. First, choose a reputable brokerage firm, open an account, and complete the necessary KYC procedures.

To invest in HG Infra Engineering Ltd, you need a brokerage account. After opening an account and completing the KYC process, you can fund your account and use the trading platform to purchase HG Infra Engineering Ltd shares.

The CEO of HG Infra Engineering Ltd is Mr.Harendra Singh, who has been leading the company with a vision to expand its renewable energy portfolio and drive sustainable growth.

OPEN FREE* DEMAT ACCOUNT