Stay up to date with the latest breaking news, analysis and commentary on Mirae Asset Sharekhan. Find live updates, exchanges, stock news, earning news and more.
Bondada Engineering has received a Letter of Award (LOA) from AP TRANSCO (Transmission Corporation of Andhra Pradesh Ltd) for the development of a large-scale Standalone Battery Energy Storage System (BESS) project.
This order is strategically significant for the Company as it establishes a long-term annuity-based revenue stream, thereby enhancing revenue stability, cash flow visibility and return predictability.
With the receipt of this order, Bondada Engineering Limited’s cumulative BESS portfolio now stands at nearly ~1 GWh, positioning the Company as a strong and credible player in India’s rapidly evolving energy storage ecosystem.
This milestone meaningfully strengthens the Company’s long-term growth visibility and aligns with India’s grid-scale energy transition and storage-led infrastructure development initiatives.
At 11.52 am, Bondada Engineering was trading at Rs. 376.10, up by 1.65%, with a volume of 1.41 lakh shares on the BSE.
BHEL commences supply of semi-high-speed traction converters for Vande Bharat Sleeper train project
8 Jan 2026, 12:31PMBHEL commences supply of semi-high-speed traction converters for Vande Bharat Sleeper train project
8 Jan 2026, 12:31PML&T wins order for Power Transmission & Distribution Business in Saudi Arabia
29-10-2025 10:13:15The ePlane Company signs MOU with Ramco Systems
27-10-2025 12:42:39Refex Industries gets an order worth Rs. 300 Cr from a mining entity in Jharkhand
24-10-2025 13:57:18Diwali Stocks Picks 2025