Stay up to date with the latest breaking news, analysis and commentary on Mirae Asset Sharekhan. Find live updates, exchanges, stock news, earning news and more.
Pace Digitek received a Letter of Intent (LoI) from BSES Rajdhani Power Limited (BSES) for the development of a 57.5 MW / 115 MWh standalone Battery Energy
Storage System (BESS) in Delhi.
The project will be developed under a 12-year Build, Own, Operate and Transfer (BOOT) model, with a project capital outlay of around Rs. 179.4 crore. The project is scheduled to be executed within seven months.
The award marks Pace Digitek's fifth major utility-scale BOO/BOOT storage project, further strengthening its portfolio of long-term contracted energy infrastructure assets. With the addition of the BSES project, the Company’s utility-scale BOO/BOOT portfolio has increased to 3.32 GWh.
Under the long-term Battery Energy Storage Service Agreement (BESSA), Pace Digitek will receive a fixed capacity tariff of Rs. 47.05 lakh per MW per year, translating into annual contracted capacity revenue of Rs. 27.1 crore.
The BSES award adds to Pace Digitek Group's recent BESS wins, including the Rs. 488.6 crore order from NTPC GE Power Services Private Limited (NGSL) for supply of standalone BESS along with AMC and warranty services, secured in September 2026.
At 11.26 am, Pace Digitek was trading at Rs. 165.10, up by 2.04%, with a volume of 0.55 lakh shares on the BSE
SEPC bags Rs. 855 Cr contract with SAIL-IISCO Steel plant in Burnpur, West Bengal
9 Oct 2026, 3:00PMPace Digitek Secures 115 MWh Utility-Scale BESS Project from BSES Rajdhani Power
9 Oct 2026, 11:34AML&T wins order for Power Transmission & Distribution Business in Saudi Arabia
29-10-2025 10:13:15The ePlane Company signs MOU with Ramco Systems
27-10-2025 12:42:39Refex Industries gets an order worth Rs. 300 Cr from a mining entity in Jharkhand
24-10-2025 13:57:18Diwali Stocks Picks 2025